PT 1.4 - Testing of Bridge





Therefore, the bridge was able to hold 20kg of the weight.


When checking the bridge for damage, we have found out that the bridge overhead was not stable enough and collapsed. Although it was still not determined whether the bridge can hold such weight, it was a real risk in real life, therefore, ending the experiment. In the future, we should have ignored the roof and it might have been better if the glue had also dried before the experiment.