PT 1.3 - Construction of bridge

Therefore, out of the builds we have chosen...



This design in the simulation is using the Truss design. The triangles in its structure are key to the equal separation of the force applied on the bridge. The force applied on the bridge splits at the joints in the structure, allowing it to support a great amount of weight.




Truss Design:
Weight: 437g
Length: 56.9cm
Breath: 5.3cm
Height: 11.6cm



No comments:

Post a Comment